Project Information
The implementation of the two Sanitized Water Pumping Plants (4 -5)  :Name of the project
New Urban Communities Authority  :Owner
New Cairo City  :Location
(Dr. Medhat Saleh)  :Designer Consultant
Envirocivic  :Supervisor Consultant
Components of the project
First: Plant No. 4
  1. Two underground Water reservoir - each 2000m3 capacity- pump rooms, generators, color, transformers and store.
  2. Four Horizontal Pumps, 860 liter/second, head 88m
  3. Four Horizontal Pumps, 500 liter/second, head 110m
  4. Two Auxiliary Caterpillar Diesel 4.5 MVA Generators complete with accessories
  5. Water hammer protection system, Two Charlet reservoir - each 70m3 capacity
  6. Two 10 MVW transformers (24 KV – 3.3 KV) + two MVW 2 MW transformers (3.3 KV)(Almaco)
  7. Complete chloride gas injection system
Second: Plant No. 5
  1. Two underground Water reservoir - each 1400m3 capacity- pump rooms, generators, color, transformers and store.
  2. Four Horizontal Pumps, 430 liter/second, head 65m
  3. Four Horizontal Pumps, 430 liter/second, head 110m
  4. Two Auxiliary Caterpillar Diesel 3.6 MVA Generators complete with accessories
  5. Water hammer protection system (24 KV – 3.3 KV) + two Almaco 2 MVW transformers (3.3 KV)(Almaco)
  6. Water hammer protection system two chalet reservoirs- each 50m3 capacity.
  7. Complete chloride gas injection system